Concrete Slab Calculator

Use the concrete slab calculator for a rectangular pour with uniform thickness. Enter dimensions or area and thickness to estimate volume and order quantity, then estimate costs using your supplier’s price or a contractor’s installed rate.

Measure your slab. Estimate concrete and costs.

For example, 10 ft 6 in = 10.5 ft.

Rectangular slab: length and width across the surface; thickness from top to bottom. lengthwidththickness
Cost estimate
Concrete cost uses the order quantity.
Order allowance
Confirm the order increment and minimum order with your supplier.
Other project costs

Enter totals for the whole project. Leave unknown costs blank. Enter 0 for no additional charge or costs included in another entered price.

Taxes, discounts, markup, and delivery apply only if included in your entered prices or amounts.

Measure the footprint and enter your dimensions

Measure the inside length and width of the forms in feet, and the planned depth from the prepared base to the finished surface in inches. Use decimal numbers: 10 ft 6 in is 10.5 ft, and 4½ in is 4.5 in. Do not include adjacent landscaping in the footprint. The diagram above identifies the three measurements.

If you already know the surface area, check I know the area and enter square feet. Thickness is still required. For an L-shaped footprint at one depth, divide it into rectangles without overlaps, add their areas, and enter that total. The form handles one uniform thickness at a time; calculate sections of different depths separately.

From surface area to volume

Area measures the surface in square feet (sq ft). Volume measures the space to fill in cubic feet (cu ft) or cubic yards (cu yd). One cubic yard equals 27 cubic feet. The slab calculator converts the entered thickness to feet before multiplying:

Area = length × width.
Measured cu ft = area × thickness in inches ÷ 12.
Measured cu yd = cu ft ÷ 27.

Use the cu yd result when discussing a ready-mix delivery. NRMCA’s ordering guide describes sales by fresh volume. For other shapes or unit conversions, try the Cubic Yard Calculator.

From measured yardage to an order quantity

The results separate three steps. Measured volume is the geometric amount from your entries. Extra concrete adds your chosen percentage: measured volume × (1 + percentage ÷ 100). Order quantity then rounds that amount upward to your selected increment.

Choose Exact quantity for no increment rounding, or select 0.25, 0.5, or 1 cu yd. An amount already at an exact multiple stays there. The defaults are 0% extra and Exact quantity. Neither default is a recommendation for your order; agree on an allowance, increment, and minimum purchase with the supplier.

Allowance and rounding serve different purposes. Rounding surplus may not cover site losses, and adding a percentage does not measure a thickened edge. NRMCA’s guidance on yield discrepancies explains how irregular subgrade, altered form dimensions, and placement losses affect quantities. Measure known extra sections separately and avoid counting the same allowance twice.

Worked example: 10 × 12 feet at 4 inches

For this example, enter Length 10, Width 12, and Thickness 4. The result is 120 sq ft and 40 cu ft = 1.4815 cu yd. A 5% allowance gives 42 cu ft = 1.5556 cu yd. Choosing a 0.25 cu yd increment raises the order to 1.75 cu yd. Displayed volumes use up to four decimal places; pricing uses the underlying quantity.

Here is a budget using hypothetical prices, not current market averages. Enter $180/cu yd and the following whole-project amounts:

Example budget using user-entered prices
CategoryAmount
Material: 1.75 × $180$315
Delivery / short-load fees$125
Site preparation / base$240
Reinforcement / forms$100
Labor / finishing$480
Other costs (enter 0)$0
Total entered budget$1,260
Per square foot: $1,260 ÷ 120$10.50

In budget mode, expand What if the slab were 1 inch thicker? after calculating. This example becomes 50 cu ft at 5 inches, 52.5 cu ft with 5% extra, and a 2 cu yd rounded order. At the same entered price, material costs $360, a $45 increase. Other expenses stay fixed in this comparison; actual charges may change. It does not recommend a construction depth.

Compare volumes for common dimensions

Compare the measured volumes below for several common slab sizes. Values are geometric cu yd rounded to four decimal places, with no allowance or supplier rounding. The 4- and 6-inch depths are arithmetic examples; they do not establish a suitable thickness for your project.

Measured volume only, in cubic yards
Length × width (ft)4 in thick6 in thick
10 × 101.23461.8519
10 × 121.48152.2222
12 × 121.77782.6667
12 × 202.96304.4444
20 × 204.93837.4074

Read the cost estimate in the right context

In Build a budget, concrete cost equals order quantity × your ready-mix price per cubic yard. Add other expenses as totals for the whole project. A blank field means an unknown cost; enter 0 when there is no additional charge or the expense is included in another amount. Without a ready-mix price, any entered extras are shown separately.

In Use a contractor’s installed rate, area is multiplied by your quoted price per square foot. At 120 sq ft and $10.50/sq ft, that is $1,260. Expenses from the other mode are not added again. Confirm that the quote covers your planned thickness and scope.

The total includes only the prices and expenses you enter. Taxes, discounts, markup, and delivery are reflected only when included in those amounts. Missing costs still need to be confirmed before you treat the result as a project budget.

Check these details before placing an order

  • Recheck the inside dimensions and planned thickness, including any changes across the footprint.
  • Account separately for thickened edges, footings, and additional sections; combine their volumes before agreeing on delivery quantities.
  • Confirm the selected allowance, order increment, minimum load, and possible short-load or delivery charges.
  • Discuss access, placement equipment, scheduling, and any fees not included in the quoted price.

The tool does not select safe thickness, reinforcement, bearing capacity, or a mix specification. Confirm those requirements with the appropriate project professional. If you plan to mix packaged material instead, use the Concrete Bag Calculator for product yields and whole-package counts.

Frequently asked questions

Can I enter square footage without length and width?

Yes. Select I know the area, enter the total square feet, and supply the thickness in inches. Area alone cannot determine the space to fill.

Why is my order higher than the measured amount?

An extra percentage increases the geometric result first. The selected supplier increment may then raise it further. Check both settings before comparing your result with a quote.

Does the tool choose a thickness for my driveway or patio?

No. Enter a depth established for your project. Changing it in the form compares quantities; it does not check loads, soil conditions, or structural adequacy.

Can I calculate in meters?

The fields use US units: feet, square feet, and inches. Convert metric measurements before entry. A value such as 10.5 in Length means 10.5 feet, not meters.

Is the displayed total a complete contractor quote?

Only your entered prices and expenses are included. A blank category remains unknown, and an installed rate includes whatever scope the contractor quoted. Ask about exclusions before using the total to plan payment.