Your material estimate
This is a purchase estimate for a straight wall of one height and one block size. Check staggered joints, cuts and reusable pieces against your layout. Confirm wall strength, drainage, reinforcement and allowable height from your project requirements and block system.
How to Use the Retaining Wall Block Estimator
Find Front grade on the diagram. Both height arrows meet at that ground line. The upper arrow ends where the top row ends, whether or not there is a cap. Enter that span in Visible block height. Follow the lower arrow to the underside of the lowest row for Buried block height. If your drawing gives the elevation at the top of the cap, subtract the installed cap thickness before entering the visible height. For Wall length, use the distance from one end of the straight run to the other along the front face.
On the supplier’s product sheet, check which size goes with the item you were quoted. For Block face length, look for the horizontal space the unit occupies when seated next to its neighbor. For Block height, use the rise from one installed row to the next. A front-to-back measurement tells you how deep the unit is. Each field has its own unit selector, so you can use feet for the wall and inches for the product dimensions.
Fill in the main fields to get the unit count. Open the material and price options as you get those details. If the plan shows a single dimension from the trench bottom to the cap, ask for the individual layer dimensions so you can enter the wall, caps and base gravel in the right fields.
How to Calculate Retaining Wall Blocks by Course
Find the number of courses first. Add the two heights you entered and divide their total by the rise of one row. Use the next whole course if there is a remainder. At 25 in of total height with a 6 in rise, the first four rows cover 24 in, so the estimate includes a fifth. Next, work out the number of positions across one row. Divide the run by the face length and allow one whole unit for any space left at the end. A 12 in face fills a 24 ft run in 24 positions. At 24 ft 1 in, the extra inch takes a 25th position in each row.
Multiply those two whole numbers to get the base count. Apply the reserve percentage to that count, then round the purchase quantity up to a whole unit. A single area calculation can group small gaps at the ends of several rows into one unit, even though each row needs its own end piece unless the cut plan allows reuse. If the rounded stack comes out taller than the height you entered, compare both dimensions in the result with your drawing. Check whether the top elevation or the burial depth needs to be reviewed.
How Many Retaining Wall Blocks Do I Need?
Select Load example to fill in a 24 ft run with a face length of 12 in. In the form, 24 in above Front grade and 6 in below it give a total of 30 in. At 6 in per row, that gives five courses. Along the wall, 288 in ÷ 12 in gives 24 positions per course. The base count is 5 × 24 = 120. A 10% reserve adds 12, bringing the purchase quantity to 132 wall blocks.
The cap option covers the same 288 in with 18 in pieces, for 16 caps at 0% reserve. The estimate lists those pieces separately from the five courses. It also shows 24 cu ft of base gravel, 60 cu ft of backfill and a Known subtotal of $608.00 for the priced items. Use these inputs to see how the form turns dimensions and prices into an estimate for each material.
How to Calculate How Many Blocks for a Retaining Wall You Should Order
After you set nine 12 in units along a 9 ft 4 in run, the row still needs a 4 in end piece. Cutting it from a tenth unit leaves less than 8 in once the saw blade takes its share. If the next course starts with an 8 in piece, that offcut may be too short. Check the finished face and the location of any connectors before counting an offcut as a usable starter. The form allows 10 units per 112 in course, so three courses have a base count of 30.
Sketch two or three neighboring courses and mark which ends need a finished face or a special unit. Each row gets its own whole count in the form. Use the sketch to have your supplier check which offcuts can serve another row before you adjust the order.
What the Retaining Wall Square Footage Calculator Measures
In the example, 24 ft × 2 ft = 48 sq ft. That is the face you see above Front grade, ending at the top of the last row before the caps. The purchase count also includes the 6 in of burial, so it uses all 30 in of wall height. In elevation, those five courses cover 60 sq ft. The buried course contributes to the order without adding to the visible area.
For separate rectangular sections, calculate the square footage of each wall section using its own visible dimensions. Where the height changes, estimate the units for each constant-height section before adding the counts. An average height can produce a different answer because each section needs its own whole courses. Keep the junction details on the sketch so shared end pieces can be reviewed before ordering.
How to Use the Retaining Wall Gravel Calculator
Open Base gravel to estimate the layer below the lowest course. The form copies the wall length until you edit the base length or its unit. If the layer extends past either end, enter the full length shown on the plan. Use the width and thickness arrows on the diagram for the other two dimensions. In the example, 24 ft × 2 ft × 6 in is 24 × 2 × 0.5 = 24 cu ft, or about 0.8889 cu yd.
These are dimensions of the space the base occupies. Ask the yard how it sells the specified material and what allowance it recommends if the plan shows installed dimensions and the quote is for loose gravel. To estimate gravel tonnage from the layer dimensions and your supplier’s density, transfer the length and width in feet and the layer thickness in inches. Run the base and backfill separately if the materials or densities differ.
How the Retaining Wall Backfill Calculator Measures the Space Behind the Wall
Use the Backfill width arrow to locate the strip between the rear face of the wall and the outer edge of the specified fill. Take the length along the wall from the plan. If the base extends under the strip, measure Backfill height from the top of the base. That keeps the material beneath the strip in the base total. Leave out the hollow cores and any fill zone your plan counts separately. The example strip is 24 ft × 1 ft × 30 in, or 60 cu ft, about 2.2222 cu yd.
If a paver path is planned behind the wall, mark its base separately on the same drawing. You can estimate the base material for the paver path using the path dimensions and the extent of its specified excavation. Check where that layer meets the wall backfill before adding quantities to a supplier order.
What the Retaining Wall Material Calculator Includes
Use Add material prices (USD) to enter a price per piece for the wall units and caps. Quote base gravel and backfill per cubic yard. In the example, 132 × $4 gives $528.00 and 16 × $5 gives $80.00. The two priced lines make up the Known subtotal of $608.00. Base gravel and backfill remain under materials without prices until you enter their rates. Leave a price blank if it is missing from the quote. Enter zero if the supplier has confirmed there is no charge.
Aggregate costs use the full calculated volume before display rounding. Ask the supplier about minimum orders, pallet quantities, delivery and tax before turning the estimate into a purchase order. If the supplier sells only by the pallet or full truck increment, write its quoted quantity beside the calculated figure so you can see what the order adds.
When to Check the Retaining Wall Estimator Against Your Block Layout
Check the instructions for your system before buying. Staggered joints can change the pieces needed at the ends, even though the total run stays the same. A corner, a step in grade, a change in wall height or a pattern with several sizes needs its own layout. A project detail may also call for separate drainage material, reinforcement or specialty units. Confirm allowable height, strength, drainage and reinforcement against the project requirements and the chosen system. Use the purchase count and material volumes to prepare the order after those details are set.
Frequently Asked Questions
Can I enter the wall length in feet and the face dimensions in inches?
Yes. Choose the unit beside each entry. For a length of 10 ft 6 in, enter 10.5 with ft selected or 126 with in selected.
Do caps count toward Visible block height?
Measure to the top of the highest row. If the wall has caps, that point is immediately below them. Use the Cap blocks option for the separate purchase count.
Why did adding a fraction of an inch change the estimate?
You may have crossed the limit of a whole course or added a position at the end of each row. Check the unit selectors and the product dimensions before planning your cuts.
Can I use the estimate to choose a burial depth or a gravel thickness?
Take both measurements from the project detail. Enter the height below Front grade in Buried block height and the depth of the layer under the wall in Base gravel thickness.